This is the start of riveting the stainless steel exhaust tunnel to the floor today
Stainless steel ramp is completed and slides between the tunnel side walls which attach to the floor
Today we completed riveting the battery box and heating vent gates to the firewall and the exhaust ramp to the tunnel side walls.
This bracket is for the Andair fuel selector vale. I have this fuel selector in my RV 7 and it has been flawless. I am really pleased this is standard equipment now in RV's.
This was made in Section 25, but gets mated to the floor pan in this section
Here we are joining the front spar bulkhead to the exhaust tunnel and tunnel ribs
All set to attach to the mid fuselage seat and baggage structure in section 29